Kerava
The apartment was bought as needing full refurbishment.
It had the original 40 year old kitchen and bathroom, plastic flooring and very
old wallpaper. This should be a quick and easy job.
It has taken a little longer than expected but at least looks nice and hopefully
finished by January 2007 ready for the next project!
|
Last
Update: 14 Dec 2006
|
|
![]() |
![]() |
| The former bathroom is now a shower room. The room was sealed (waterproofed). I tiled it all with simple wavy white wall tiles and dark grey floor tiles all grouted in grey. Looks clean. Just needs silicon, WC, sink, taps and original towel warmer. | We put the floor down (Dec 06) which took a day. It has made the flat look a million times better. All the door frame lists and skirting boards can be put on now. |
![]() |
![]() |
|
The
kitchen is quite small. The old carcasses were removed. New electrics
were added and a new tiled floor. The new kitchen cabinets are
simple white doors and birch effect counter tops. All splashbacks have
been tiled. Still a little work to do.
|
The
original kitchen was about 30 years old and needed updating. The
cabinets were very heavy old chipboard and removing was a job and a half.
|
![]() |
![]() |
|
During
the Summer the exterior of the apartments had new drains added. The gardens
were then landscaped which now look very nice indeed.
|
The
kitchen tiles have been completed. Just need grouting. They should compliment
the colour of the units.
|
![]() |
![]() |
|
The
new shower walls have been completed. The original mains towel
warmer will have to be connected and fixed.
(No broken tiles I hope!) |
The
original bathroom had a VERY heavy steel bath which had to be cut
into pieces. The lovely yellow tiles and black glass floor tiles were
all removed before the room was fully waterproofed.
|
![]() |
|
|
The balcony was renovated
as part of the exterior block renovation about 1-2 years ago and is in
excellent condition.
|