Aberdare
The semi
detached ex-council house in Heol-Kier Hardie was in need of a complete renovation.
Good points were that
it had uPVC double glazing throughout and a very recent kitchen which was a
BIG saving.
|
Last
Update: 10 Dec 2006
|
|
|
|
|
|
The former owners
had reduced the size of the window as this used to be a second sitting
room. The brickwork had to be redone as it wasn't interlaced. Once done
and plastered I tiled the surrounds, which looked good.
|
The
kitchen was already fitted and just needed new tiles to the splashbacks.
The units were oak and in very good condition. The ceiling was also replastered
and repainted.
|
|
|
|
|
One
of the biggest jobs was to remove ALL of the old wallpaper and take it
back to the original plaster and repaint. Once done and painted in the
'great' magnolia looked excellent.
|
The
staircase was once of the longest jobs. The complete bannister and walls
were repainted to the original white colour.
|
|
|
![]() |
|
The
new lounge once finished looked excellent.
A new gas-fired fireplace was added along with a wooden surround and man-made marble hearth and backplate. The original back burner heating system was removed and a new combi system fitted. |
The
original lounge was very outdated. The back boiler and old hazardous
gas fire had to be replaced. All the walls had the wallpaper removed back
to the original plaster and repainted.
|
![]() |
|
|
This is the new
2nd reception room converted from the old kitchen. I converted this to
a second reception room/office. The original cabinets, sink tiles etc.
were all replaced with a radiator, wooden flooring and simple cornicing.
|
This was the original
kitchen which was in a really terrible state.
|
|
The new second reception
room looked bright with new lighting, walls and coving.
|
|
![]() |
|
|
The
new bathroom was completely overhauled. A new suite with main shower
was added and the majority of the walls were tiled in simple but clean
white tiles.
|
The
original bathroom had a huge corner bath which didn't fit. The
tiles had been removed and the walls and floor were in a poor state.
|
|
|
|
|
A new mains powered
thermostatic shower was added.
|
|
![]() |
|
|
The
new main bedroom had all the wallpaper painted and looked neat.
I added a new carpet here to match the lounge carpet. Simple cornice was
also added to the ceiling.
|
The original
colours were vivid to say the least! All doors in the property were removed
and replaced with new white ones.
|
|
|
![]() |
|
The new third
bedroom was cleaned up and new flooring added.
|
The original third
bedroom had some renovation already started but not completed. All walls
had to be prepared which was a lengthy process.
|