Träskby
This is
the current state of the
Träskby house building project.
The main additions in 2006 have been porches, sauna, bathroom, lower balcony
terrace, front door porche,
cold closed balcony and cleaned up surrounding garden area.
|
Last
Update: 01 Jan 2007
|
|
![]() |
![]() |
|
Dec
2006. The back balcony had railings and sliding glass added in March 2006.
This stops rain and wind but can still be pretty cold in the winter. The
windows below are the sauna.
|
The
current state of the house as of December 2006. The lower balcony has
been added and the smaller porch roof.
|
![]() |
![]() |
| The large porch roof was added in 2006. It was increased to fully reach the balcony. Basic wood structure with supporting wood columns and metal bars sunk and glued into the walls. | Dec 2006. The side porch was built in Summer 2006. Still need steps and outside tiles on the base. Also the whole house requires the base plastered in grey (granite effect) waterproof paint. |
![]() |
![]() |
|
The
outside lights have been added. There are infra-red ones above the doors
and switched ones above the balcony area. Some lights in the photo have
not yet been connected.
|
2006. The prorch
has been added. Wood has to be added to finish it off and a small gutter
and drain added too. White tin will be added to the balcony as a sill
for rain etc.
|
![]() |
![]() |
|
2006.
The first sauna seats were made from alder wood and should last several
years. 4 more structures will also be made. The white circle behind is
a speaker not air vent!
|
Balcony
glass was added in Jan 2006 to the front balcony. You can just make out
the lake. We will probably tile the balcony surface.
|
|
|
|
|
August
2004. Small sunbathing terrace made next to the house.
|
|
|
July
2004. The Lounge windows were a change to the design - good in the Winter
VERY bright in the Summer.
|
2004.
Dining Room.
|
|
|
|
|
2004.
The Fireplace Room. Tiled with small Nunnauuni
fireplace which has a large hot surface for cooking if required. The door
leads to the room which holds the air-con, land-heating, central vacuuming
and TV/Sat/Net units.
|
2003.
Master Bedroom.
|
![]() |
![]() |
|
The
Kitchen bar area. The surfaces are heat varnished solid cherry wood and
granite.
|
The
Kitchen is nearly completed. The small glass tiles might be replaced in
2007 (one of the first changes!) but we'll see.
The doors are stained beech. |
![]() |
|
|
Oct
2004. Main house structure rendered. No glass as yet and no lower balcony
terrace. Looks better than the grey box!
|
Main
structure is complete (2004). The exterior is Siporex with no exterior
rendering (and colour) as yet. The door will be changed to a teak one
at some point and glass and wood added to the balcony supports. Note the
snowmen !
|
|
|
|
|
Sept
2003. Interior plastering has been done. The floor has the layer of cement
covering the underfloor heating, electricity/IT/TV cables. Ladders lead
to the loft space on one half of the house.
|
|
![]() |
![]() |
|
August 2002. Balcony done. Breeze block supports in place and temporary wooden supports removed. :-) |
August
2002 Roof tiles on, windows in and it still looks like a square grey box!
|
![]() |
![]() |
|
June 2002. The structure
is nearly ready. Note that the roof is solid Siporex which is good and
bad; insulation wise very good, adding holes through the roof (aerial,
vents etc.) difficult. Balcony cement structures started.
|
The wooden part of
the roof has been completed, just need to add tiles. Still no windows.
|